Based in Karratha, Drilltech’s Devil Creek operation required the services of Steel Diamond to lay 2.5km of beach pool pipeline.
As part of the requirement, the pipeline installation featured 32inch concrete casing pipe and was completed in 2 weeks.
If you have a project enquiry or would like to reqest more information on our services, simply complete the form below for more information.