CBD Risk Reduction – Elizabeth Quay Reinforcement • ATCO Gas Australia
The Company requires the construction of approximately 2,400m long DN150 Class 150 Gas Pipeline HP142 (MAOP 1900kPa) AS2885.1 gas pipeline in accordance with the Final Design.
Construction is currently underway.